Faculty of Medicine, Chiang Mai University

Gasification technology Model GB-20

Combustion capacity 3 tons a day

Faculty of Medicine, Chiang Mai University

Japan International Cooperation Agency (JICA) is corporate with KINSEI Sangyo Co., Ltd, Japan and Faculty of Medicine, Chiang Mai University signed Memorandum of understanding (MOU) in project of distribution Japan technology for medical waste incineration with gasification technology GB-20 at Faculty of Medicine, Chiang Mai University. The project has been successfully delivered with complete machine installation. We organized via Webinar-Zoom Meeting to exchange knowledge about Medical waste gasification technology model GB-20 on 18 October 2021 at 15th floor meeting room, Chalermprabaramee building, Faculty of Medicine, Chiang Mai University. Mr Jakkarin Lodkhuntod, Managing Director of JT Engineering Supply Co., Ltd would like to thank Professor (specialty) Doctor Bannakit Lojanapiwat, Dean of Faculty of Medicine, Chiang Mai University, Mr. Hiroshi Matsumoto, Consul General of Chiang Mai province, Mr. Takahiro Morita, Head of JICA Thailand, Dr.Yuko Yasunaga, Head of United Nations Industrial Development Organization – Invesment and Technology Promotion Office, Tokyo (UNIDO–ITPO Tokyo),  Dr. Keiichi Kaneko, Managing Director of KINSEI Sangyo Co., Ltd, Japan, Miss Noppawan Nantapong, Director of Bureau of Environmental Health, Department of Health, Ministry of Public Health, and all participants from government and private companies.

Project Detail

Date

December 7, 2015

Customer

Faculty of Medicine, Chiang Mai University

Project type

Gasification technology model GB-20

Responsible company

JT Engineering Supply, Co., Ltd

Installation and usage details

Installation

Installation by JT Engineering Supply Co., Ltd. Some supply equipment is manufactured in Japan and imported to install at Faculty of Medicine, Chiang Mai University.

Training

Training is performed at head office of KINSEI Sangyo, Japan with driving test in the company and learn to use equipment correctly and thoroughly.

To feed medical wastes

To feed medical wastes, it is not required to do re-processing e.g. crushing. Therefore, the container is not damage and safe. Volume of medical wastes is 20 cubic meters with opening of incinerator, it can be disposed large volume

Operational testing

We perform operational testing with local staffs in order to practice and learning on how to use the machine and perform maintenance during actual driving.

Environmental Test

Air pollution test is performed at gas output equipment to meet the standard of air pollution control from medical waste incinerator as per announcement of Ministry of Natural Resources and Environment dated 15 December 2003 or recent standard with following parameters.

ประเภทของสารมลพิษทางอากาศ ค่ามาตรฐานการระบายสารมลพิษ  (ไม่เกิน) วิธีกรตรวจวัด
ค่าก๊าซซัลเฟอร์ไดออกไซด์ (SO2) (ppm) 30 USEPA Method หรือวิธีอื่นที่คณะกรรมการควบคุมมลพิษเห็นชอบ
ค่าก๊าซออกไซด์ของไนโตรเจนในรูปก๊าซไนโตรเจนไดออกไซด์ (NOX) (ppm) 180 USEPA Method หรือวิธีอื่นที่คณะกรรมการควบคุมมลพิษเห็นชอบ
ค่าก๊าซไฮโดรเจนคอลไรด์ (HCI) (ppm) 25 USEPA Method หรือวิธีอื่นที่คณะกรรมการควบคุมมลพิษเห็นชอบ
ค่าก๊าซไฮโดรเจนฟลูออไรด์ (HF) (ppm) 25 USEPA Method หรือวิธีอื่นที่คณะกรรมการควบคุมมลพิษเห็นชอบ
ค่าสารประกอบไดออกซิน ซึ่งคำนวณผลในรูปของหน่วยความเข้มข้น USEPA Method หรือวิธีอื่นที่คณะกรรมการควบคุมมลพิษเห็นชอบ
เทียบเคียงความเป็นพิษต่อมนุษย์ (PCDD/Fs as International Toxic Equivalent; I-TEQ) (i-TEQ/Nm) 0.5
ค่าปริมาณฝุ่นละออง (Total Suspended Particulate (mg/Nm) 120 USEPA Method หรือวิธีอื่นที่คณะกรรมการควบคุมมลพิษเห็นชอบ
ค่าความทึบแสง (Opacity) (%) 10 USEPA Method หรือวิธีอื่นที่คณะกรรมการควบคุมมลพิษเห็นชอบ
ค่าสารปรอท (Hg) (mg/Nm) 0.05 USEPA Method หรือวิธีอื่นที่คณะกรรมการควบคุมมลพิษเห็นชอบ
ค่าสารแคทเมียม (Cd) (mg/Nm) 0.05 USEPA Method หรือวิธีที่กรมควบคุมมลพิษเห็นชอบ
ค่าสารตะกั่ว (Pb) (mg/ Nm) 0.5 USEPA Method หรือวิธีอื่นที่คณะกรรมการควบคุมมลพิษเห็นชอบ

Remark – The calculation of air pollution concentration is compared to refence condition at 25°C, pressure 760 millimeter of mercury or 50% excess air combustion volume of air pressure at dry basis or 7% Oxygen.

Delivery

Operational test of medical waste incinerator is completed and delivered to customer. Even though it is large machine, it is required one (1) operator. In addition, KINSEI partner company in Thailand, JT Engineering, provides fully support on system management and consultation.